Data Centers and Infrastructure

Data centers designed around the hardware they will hold.

Capacity planning, white space layout, power and cooling coordination, structured cabling, physical security and commissioning, for server rooms and data halls.

Sound familiar

Where this usually starts.

A data center is designed backwards from the equipment it will run: how many kilowatts per rack, how much heat, how much weight and how many fibers. We start there, then plan white space, power distribution, cooling, cabling, containment, monitoring and physical security, working with the facility engineers and contractors who build the mechanical and electrical plant. The result is a room that can be expanded without being redesigned.

Tick the ones that sound like your situation.

Scope

What is included.

  • Capacity planning

    Power, cooling, space and network demand modeled from the planned equipment.

  • White space layout

    Rack placement, hot and cold aisle containment, and clearances.

  • Power distribution

    UPS, PDUs and redundant feeds sized and coordinated with electrical contractors.

  • Cooling coordination

    Air or liquid cooling chosen and designed with mechanical engineers.

  • Structured cabling

    Copper and fiber plant designed, installed and labeled to standard.

  • Monitoring and security

    Environmental monitoring, DCIM, access control and CCTV.

Reference architecture

From the hall to the rack to the GPU.

Design and build own the facility layer of the data center architecture: power, cooling and the data hall itself, sized for the racks and AI compute that will run there.

From the hall to the rack to the GPU. THE FACILITY RACKS AI COMPUTE OPERATE AND RETIRE Power Cooling Data hall Racks and cabling Servers Storage GPU nodes Compute fabric Monitoring and DCIM Smart hands Migration Decommissioning

What this service delivers here

  • Power

    Feeds and distribution sized for each rack's density, with redundancy you chose.

  • Cooling

    Air or liquid, designed for the heat the hardware will actually produce.

  • Data hall

    Layout, containment and physical security, in your building or a colocation site.

Walk through every flow in Data Centers and Infrastructure

Before you start

Decisions to settle early.

  • Build, refit or colocate

    Building your own room gives control; refitting an existing one is cheaper; colocation moves the facility risk to an operator. The load, the timeline and the capital available decide.

  • Air or liquid cooling

    Air cooling is simpler and suits moderate density; liquid cooling suits accelerated systems. Many rooms need both, in separate zones.

  • How much redundancy

    Every redundant feed and unit costs money. The design matches redundancy to what an outage would cost the business.

Approach

How the work runs.

  1. Plan

    Demand modeled from the equipment

  2. Design

    Layout, power, cooling and cabling

  3. Build

    Installation coordinated with contractors

  4. Commission

    Tested at load before handover

Commercials

How it is bought.

  • A fixed-fee assessment

    We model power, cooling, space and network demand from your planned equipment and survey the existing room or site. You receive the capacity model, the constraints and a fixed design price.

  • A fixed-price build

    Design, coordination with electrical and mechanical contractors, cabling and commissioning for the scope agreed, priced before work starts.

  • Running it afterwards

    After handover, monitoring and on-site support can continue under our colocation and smart hands service.

Start with the assessment.

Scope an assessment

Worked example

A server room that became a data center.

Say a university's research computing has grown into a room never designed for it: racks are full, cooling struggles in summer, and new GPU servers need more power per rack than the room can deliver.

  1. Model

    We model power, heat, weight and network demand from the planned equipment and the expected growth in research, rather than from the current room.

  2. Design

    A new layout with aisle containment, higher density rows for accelerated systems and a structured cabling plant is drawn and agreed.

  3. Coordinate

    The electrical and mechanical engineers design the power and cooling plant against our load model, and we check their designs against the IT need.

  4. Commission

    The finished room is tested under load with heat load banks before any research system moves in, and the as-built drawings are handed over.

At the end, the university has a room designed for the equipment it will run, space to grow without a redesign, and documentation that matches what was built.

An illustration

An illustration, not a client account.

Where it goes wrong

What we design out.

  • Designing for today's load

    A room sized for current equipment is outgrown by the next refresh. Pathways and capacity are sized for the end state.

  • Cooling decided last

    High density racks fail on heat, not space. Cooling is chosen with the equipment, not after it.

  • Drawings that drift

    As-built documentation that does not match the room misleads every later change. Drawings are updated at handover.

Outcomes

What it changes.

  • Room to grow

    Capacity is planned for the next generation of equipment, not just the current one.

  • Fewer single points of failure

    Redundancy is designed into power, cooling and network paths from the start.

  • Documentation that matches reality

    As-built drawings and cabling records make every future change safer.

How you will know it is working

  • The room supports the planned density without hot spots.
  • Expansion means installation, not redesign.
  • Commissioning tests passed under load before handover.
  • Drawings match what is installed.

You keep

What you have at the end.

Handover pack

five items

  1. Capacity and growth model Power, cooling, space and network demand from the planned equipment, and how it grows over the life of the facility.
  2. Layout and rack elevation drawings Rack placement, aisles, containment and clearances, and the position of each device in each rack.
  3. Power and cooling design coordination The IT load and redundancy given to the electrical and mechanical engineers, and their designs checked against it.
  4. Cabling design and test results The copper and fiber plant as designed and as installed, with the test results for every link.
  5. Commissioning report and as-built documentation How the room performed under load before handover, and drawings that match what was built.

The team

Who you work with.

  • Data center architect

    Models capacity and designs the layout, power distribution, cooling and cabling.

  • Project engineer

    Coordinates the electrical and mechanical contractors and keeps the build to the design.

  • Commissioning engineer

    Tests the room under load and signs off the as-built documentation.

What we need from you

  • The equipment you plan to run, now and over the coming years.
  • Drawings and surveys of the existing room or site.
  • Your electrical and mechanical contractors, if you have them.
  • The date the room must be ready.

Planned for the load it will carry in five years, not the one it carries today.

Questions

Questions we get asked.

Do you build the electrical and mechanical plant?

We design the IT space and coordinate with licensed electrical and mechanical contractors who build the plant, so the requirements of the equipment drive their design and nothing is lost between trades.

Can you design for high density AI racks?

Yes. Racks of current accelerators can draw several times the power of a typical enterprise rack, which changes power distribution, cooling and floor loading. We design those zones separately from general purpose space.

Which standards do you design to?

ANSI/TIA-942 and EN 50600 for data center infrastructure, ASHRAE guidance for thermal conditions, and TIA and ISO cabling standards, applied at the level of resilience the business actually needs.

Can you work in an existing, live facility?

Yes. Work in live spaces is planned around change windows, with method statements and rollback agreed with the facility operator before anything is touched.

What is hot and cold aisle containment?

A layout in which racks face each other so cold air is delivered to a shared aisle and hot exhaust is collected on the other side, with physical barriers that stop the two mixing. It makes cooling more efficient and predictable, and it is often the cheapest way to raise the density a room can support.

How do you plan for growth in a new facility?

By designing the full capacity the site can reach and building it in phases. Power, cooling and cable pathways are sized for the end state, and equipment is added as demand arrives, so expansion is installation rather than redesign.

What is DCIM?

Data center infrastructure management: software that tracks assets, space, power and environmental conditions across a facility. It shows where capacity remains, warns when conditions drift, and keeps the record of what is installed where.

Can you design to a particular Uptime Institute tier?

We design to the redundancy and maintainability concepts the tiers describe, and to ANSI/TIA-942 and EN 50600. Formal tier certification is awarded by the Uptime Institute itself, and where a client wants it, the design is prepared for that review.

Ask about your situation

Answered from this site, with its sources.

CONTACT

Size the room for the equipment, not the other way around.

Share the equipment you plan to run and the space you have. We will return a capacity, power and cooling plan.

  • Senior-led
  • Accountable
  • Direct
  • Fixed-price options
  • Compliance-ready
  • 24/7 capable

Prefer to talk it through? Call +92 (333) 32 11011

What happens next

  1. You pick the time

    Share what equipment you plan to run, even roughly; we arrange the call around you.

  2. Thirty minutes, with an engineer

    A data center engineer discusses the room, the load and the date it needs to be ready.

  3. A written assessment

    You receive a written capacity model and a fixed design price.